翻訳と辞書
Words near each other
・ Sanhe Township, Heilongjiang
・ Sanhe Township, Kangding County
・ Sanhe Township, Tongjiang County
・ Sanhe Township, Xuanhan County
・ Sanhe Township, Yingjing County
・ Sanhe, Bishan County
・ Sanhe, Dabu County
・ Sangtam Naga
・ Sangtar
・ Sangtarash
・ Sangthang
・ Sangthankima
・ Sangtok
・ Sangtu
・ Sangtuda
Sangtuda 1 Hydroelectric Power Plant
・ Sangtuda 2 Hydroelectric Power Plant
・ Sangu
・ Sangu (armour)
・ Sangu Daily
・ Sangu language
・ Sangu language (Gabon)
・ Sangu language (Tanzania)
・ Sangu people
・ Sangu River
・ Sanguan Tularaksa
・ Sanguansi, Cili
・ Sanguantang Station
・ Sangudo
・ Sangue al sole


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Sangtuda 1 Hydroelectric Power Plant : ウィキペディア英語版
Sangtuda 1 Hydroelectric Power Plant

Sangtuda 1 Hydroelectric Power Plant is a hydroelectric power plant, located on the Vakhsh River in Tajikistan. Construction commenced during the Soviet period in the 1980s, but halted in the beginning of the 1990s due to lack of financing when the station was about 20% complete. An agreement with Russia allowed to restart the construction, with four units entering service in 2008–2009. The plant was officially commissioned on 31 July 2009. Once working at full capacity, the plant will provide around 12% of Tajikistan's electricity output.
==History==

Plans to build the power plant were made during the 1970s, with the actual construction commencing in 1989.〔
Dissolution of the Soviet Union, the resulting halt of financing, as well as the Civil War in Tajikistan interrupted the construction for over a decade. In 1996, the government set up a company for the construction of the power plant and issued public shares. However, the company did not start operating and was liquidated when a deal with Russia was signed.〔
In October 2004, an intergovernmental agreement was signed by Russia and Tajikistan to complete the project.〔
〕 In January 2005, Russia, Tajikistan and Iran signed a protocol according to which Russia would participate in construction of Sangtuda 1 and Iran in construction of Sangtuda 2 power plants.〔 On 16 February 2005, a joint Russian-Tajik company Sangtudinskaya GES-1 was established.〔
〕 Construction resumed in April 2005.〔〔

The first unit entered service ahead of schedule on 20 January 2008 during the unusually harsh winter, with temperatures dipping below , which put the Tajik energy system on the brink of collapse.〔〔
〕 The second and third units entered service on 1 July 2008, and 15 November 2008, respectively. The fourth and final unit was brought online on 15 May 2009.〔 On 31 July 2009, the plant was officially commissioned, with the presidents of Russia and Tajikistan Dmitry Medvedev and Emomalii Rahmon participating in the event.〔